From: Randy Rose
Sent: Thursday, May 5, 2011
To: Larry G. Clark
Subject: IPB4 100 Meg Upgrade Project
Good Morning Larry,
I wanted to send you a quick note to let you know what a good job the crew did on the IPB4 100 Meg upgrade project. The customer conducted time studies, both before and after the work was complete, and the results were better than expected. They were very pleased with the outcome of the project.
Please see the note below, and please pass this on to those involved.
Thanks,
Randy Rose
Facilities Project Administrator
Spirit AeroSystems, Inc.
Phone 316-523-8471
Randy and the 100MB Team had the review this morning for finishing up the 3-187S (IPB4) 737TR 100MB Project.
Since the project is nearing completion April 29, we wanted to provide you with some feedback from Shop Mechanics, Team Leaders, Managers and Support Personnel.
We received many comments during the four phase cable installation and cutover processes about how great the Linder Team was at coordinating with the people, being considerate of manufacturing to disrupt processes as little as possible, really knowing what they are doing, following up on any issue with timely resolution, having great customer service skills. They really worked hard to meet our requirements.
Please thank the entire Linder Team for us and express our appreciation for getting our IPB4 737 Thrust Reverser 100MB project completed successfully.
Avis Nelson
__|__
*--o---(_)---o--*
Spirit AeroSystems, Inc.
Propulsion Structures & Systems - 737 Support
526-6491 K77-57
Electrician's on project:
Thank you to: Brian Belanger, Lance Nolan, Paul Cooper, Clinton Townsend, Krassimir Damianov, Trenton Coe, Brad Clingan, Brian Geist, Terry Branscum, Mike McGinnis, Derek Hogan, Erik Mason, Jeff Elliot, and Everett Haskins
Sent: Thursday, May 5, 2011
To: Larry G. Clark
Subject: IPB4 100 Meg Upgrade Project
Good Morning Larry,
I wanted to send you a quick note to let you know what a good job the crew did on the IPB4 100 Meg upgrade project. The customer conducted time studies, both before and after the work was complete, and the results were better than expected. They were very pleased with the outcome of the project.
Please see the note below, and please pass this on to those involved.
Thanks,
Randy Rose
Facilities Project Administrator
Spirit AeroSystems, Inc.
Phone 316-523-8471
Randy and the 100MB Team had the review this morning for finishing up the 3-187S (IPB4) 737TR 100MB Project.
Since the project is nearing completion April 29, we wanted to provide you with some feedback from Shop Mechanics, Team Leaders, Managers and Support Personnel.
We received many comments during the four phase cable installation and cutover processes about how great the Linder Team was at coordinating with the people, being considerate of manufacturing to disrupt processes as little as possible, really knowing what they are doing, following up on any issue with timely resolution, having great customer service skills. They really worked hard to meet our requirements.
Please thank the entire Linder Team for us and express our appreciation for getting our IPB4 737 Thrust Reverser 100MB project completed successfully.
Avis Nelson
__|__
*--o---(_)---o--*
Spirit AeroSystems, Inc.
Propulsion Structures & Systems - 737 Support
526-6491 K77-57
Electrician's on project:
Thank you to: Brian Belanger, Lance Nolan, Paul Cooper, Clinton Townsend, Krassimir Damianov, Trenton Coe, Brad Clingan, Brian Geist, Terry Branscum, Mike McGinnis, Derek Hogan, Erik Mason, Jeff Elliot, and Everett Haskins
From: Jason Gillig
Sent: Friday, July 20, 2007 8:27 AM
To: Larry G. Clark
Cc: Mark Hutton; Jack Schulte
Subject: RE: FINAL FIRE ALARM INSPECTION REPORT
Larry,
Thanks for the report.
I want you to know that I and Hutton Construction truly appreciate all that yourself, David Woley and Linder has done on this project. It is a pleasure to work with professional, honest and caring people in the completion of our projects. You have met each challenge with a mature attitude that seems hard to find in the subcontractor community these days. As we move forward from this project your excellent performance will not be forgotten and you can be sure that we will continue to look for ways to continue our relationship with Linder and Associates. Please pass on my thanks to David and the rest of your team and let me know if there is anything that you need.
Thanks Again,
Jason M Gillig
Hutton Construction Corp.
Ph - (316) 942-8855
Fax - (316) 942-8881
Sent: Friday, July 20, 2007 8:27 AM
To: Larry G. Clark
Cc: Mark Hutton; Jack Schulte
Subject: RE: FINAL FIRE ALARM INSPECTION REPORT
Larry,
Thanks for the report.
I want you to know that I and Hutton Construction truly appreciate all that yourself, David Woley and Linder has done on this project. It is a pleasure to work with professional, honest and caring people in the completion of our projects. You have met each challenge with a mature attitude that seems hard to find in the subcontractor community these days. As we move forward from this project your excellent performance will not be forgotten and you can be sure that we will continue to look for ways to continue our relationship with Linder and Associates. Please pass on my thanks to David and the rest of your team and let me know if there is anything that you need.
Thanks Again,
Jason M Gillig
Hutton Construction Corp.
Ph - (316) 942-8855
Fax - (316) 942-8881
Westlink Christian Church
August 8, 2003
Mr. Randy Sobba
Linder and Associates
840 N. Main St.
Wichita, KS 67213
Dear Randy,
Just a note to let you know how much we appreciate the good work and quality customer service that you personally and your company have provided on our new church facility at 2001 N. Maize Road.
The enclosed 5-minute video is a pictorial review of the construction process that was used as part of our dedication services on July 19 & 20. It is just a small token of our appreciation and something that I hope will give you a great deal of satisfaction as you think back on the work that you have done on this project.
We are forever indebted to you and the people in your company who have often gone above and beyond the call of duty in seeing this facility become a reality.
Thanks again for your efforts on our behalf. You have not only served us well, but your service will make a difference for eternity.
Sincerely,
Larry Wren
Executive Pastor
August 8, 2003
Mr. Randy Sobba
Linder and Associates
840 N. Main St.
Wichita, KS 67213
Dear Randy,
Just a note to let you know how much we appreciate the good work and quality customer service that you personally and your company have provided on our new church facility at 2001 N. Maize Road.
The enclosed 5-minute video is a pictorial review of the construction process that was used as part of our dedication services on July 19 & 20. It is just a small token of our appreciation and something that I hope will give you a great deal of satisfaction as you think back on the work that you have done on this project.
We are forever indebted to you and the people in your company who have often gone above and beyond the call of duty in seeing this facility become a reality.
Thanks again for your efforts on our behalf. You have not only served us well, but your service will make a difference for eternity.
Sincerely,
Larry Wren
Executive Pastor
JEDUNN
CONSTRUCTION TOPEKA
February 5, 2003
Mr. Randy Sobba
Project Manager
Linder & Associates
840 N. Main, PO Box 1202
Wichita, Kansas 67201-1202
RE: Butler County Jail Project
J.E. Dunn Project No. 8297
Dear Randy,
In preparation for the ribbon cutting ceremony at the Jail, J.E. Dunn Construction Company would like to take this opportunity to express our sincere appreciation to Linder & Associates for your Company's performance on the above referenced project. As Construction Manager, we are certain that the Butler County Jail project would not have been an enormous success if it were not for the efforts of Linder & Associates. We have come to appreciate your Company's reliable performance and consummate professionalism.
Please express our appreciation to your foreman, Larry Gilbert, and your associated field and office personnel involved with the Butler County projects. We look forward to the opportunity to continue to work with Linder & Associates on any future projects.
On behalf of J.E. Dunn Construction Company, thank you.
Respectfully,
J.E. DUNN CONSTRUCTION COMPANY
Dan J. Ferguson
Senior Project Manager
CONSTRUCTION TOPEKA
February 5, 2003
Mr. Randy Sobba
Project Manager
Linder & Associates
840 N. Main, PO Box 1202
Wichita, Kansas 67201-1202
RE: Butler County Jail Project
J.E. Dunn Project No. 8297
Dear Randy,
In preparation for the ribbon cutting ceremony at the Jail, J.E. Dunn Construction Company would like to take this opportunity to express our sincere appreciation to Linder & Associates for your Company's performance on the above referenced project. As Construction Manager, we are certain that the Butler County Jail project would not have been an enormous success if it were not for the efforts of Linder & Associates. We have come to appreciate your Company's reliable performance and consummate professionalism.
Please express our appreciation to your foreman, Larry Gilbert, and your associated field and office personnel involved with the Butler County projects. We look forward to the opportunity to continue to work with Linder & Associates on any future projects.
On behalf of J.E. Dunn Construction Company, thank you.
Respectfully,
J.E. DUNN CONSTRUCTION COMPANY
Dan J. Ferguson
Senior Project Manager
Diocese of Dodge City
910 Central •P.O. Box 137•Dodge City, KS 67801
December 12, 2001
Linder & Associates
Attn: Randy Sobba
P O Box 1202
Wichita, KS 67201-1202
Dear Randy:
I am writing today to thank you and your company for the cooperation and assistance in the construction of the Cathedral of Our Lady of Guadalupe. It is truly a beautiful complex that will serve the Catholic Church in southwest Kansas for many years to come.
Also, please convey my thanks especially to Russ Wedel, the jobsite foreman on this project. Russ was a very enjoyable person to work with and was helpful in explaining what was going on from the electrical side of the project. He certainly made me understand the project better and I appreciate all he did to make this job successful.
Perhaps, sometime in the future we will have the opportunity to work together again. Thanks again, and if you are out in the area, feel free to stop in for a visit.
Sincerely,
Daniel M. Stremel, CPA
Finance Director
910 Central •P.O. Box 137•Dodge City, KS 67801
December 12, 2001
Linder & Associates
Attn: Randy Sobba
P O Box 1202
Wichita, KS 67201-1202
Dear Randy:
I am writing today to thank you and your company for the cooperation and assistance in the construction of the Cathedral of Our Lady of Guadalupe. It is truly a beautiful complex that will serve the Catholic Church in southwest Kansas for many years to come.
Also, please convey my thanks especially to Russ Wedel, the jobsite foreman on this project. Russ was a very enjoyable person to work with and was helpful in explaining what was going on from the electrical side of the project. He certainly made me understand the project better and I appreciate all he did to make this job successful.
Perhaps, sometime in the future we will have the opportunity to work together again. Thanks again, and if you are out in the area, feel free to stop in for a visit.
Sincerely,
Daniel M. Stremel, CPA
Finance Director
SNODGRASS & SONS
CONSTRUCTION CO., INC.
September 19, 2000
Mr. Randy Sobba
Linder & Associates
840 North Main
P.O. Box 1202
Wichita, KS 67201-1202
RE: CENTRAL CHRISTIAN CHURCH
Dear Randy:
I want to take this opportunity to thank you and the Linder team for your efforts on the Central Christian Church Worship Center project.
I have worked with you and your firm a number of times through the years and have found that each project is managed professionally and honestly. This project was no exception.
As Chairman of the Central Christian Church Building Committee I want to thank you for a job well done.
Sincerely,
Steve Slusher
CONSTRUCTION CO., INC.
September 19, 2000
Mr. Randy Sobba
Linder & Associates
840 North Main
P.O. Box 1202
Wichita, KS 67201-1202
RE: CENTRAL CHRISTIAN CHURCH
Dear Randy:
I want to take this opportunity to thank you and the Linder team for your efforts on the Central Christian Church Worship Center project.
I have worked with you and your firm a number of times through the years and have found that each project is managed professionally and honestly. This project was no exception.
As Chairman of the Central Christian Church Building Committee I want to thank you for a job well done.
Sincerely,
Steve Slusher
HAYES (received November 9, 2001)
Charlie Rishel
Linder & Associates, Inc.
840 North Main
Wichita, KS 67203
Re: Letter of Appreciation
Dear Mr. Rishel:
The Hayes Company, Inc. IT Department would like to commend you and your project team for an outstanding job relative to our recent construction project. The team was very committed to helping the Hayes Company, Inc. build a solid data network structure. Your employees truly are experienced professionals. We are very proud of the work Linder & Associates has done and would not hesitate to recommend your services.
Sincerely,
Kim M. Heese
IT Manager
The Hayes Company, Inc.
7700 Hayes Drive, P. O. Box 430
Valley Center, KS 67147
T: 316-838-8000 F: 316-832-9126
Charlie Rishel
Linder & Associates, Inc.
840 North Main
Wichita, KS 67203
Re: Letter of Appreciation
Dear Mr. Rishel:
The Hayes Company, Inc. IT Department would like to commend you and your project team for an outstanding job relative to our recent construction project. The team was very committed to helping the Hayes Company, Inc. build a solid data network structure. Your employees truly are experienced professionals. We are very proud of the work Linder & Associates has done and would not hesitate to recommend your services.
Sincerely,
Kim M. Heese
IT Manager
The Hayes Company, Inc.
7700 Hayes Drive, P. O. Box 430
Valley Center, KS 67147
T: 316-838-8000 F: 316-832-9126
November 6, 2000
To Whom it May Concern:
In the past few months, I have had the opportunity to observe Linder And Associates, Inc., as the electrical sub-contractor on a new high school Renwick USD 267 is building. As the superintendent of the district, I am responsible for all the construction within the district.
During my brief association with Linder, they were asked to expedite the installation of the electrical service and six light poles for our newly built football stadium at Andale. Unlike other sub-contractors that I have worked with, Linder was willing to go the "extra mile" and provide the materials, personnel, and leadership to get the job done according to our needs. They understood the political problem we were under and made every effort to help us complete the football stadium before the first home game of the 2000 football season.
I would highly recommend Linder And Associates to anyone, based on the high level of quality and service we at Renwick School District have experienced.
I would certainly make myself available to anyone interested in hiring Linder And Associates.
Sincerely,
Dr. Dan Peters
Superintendent of Schools
To Whom it May Concern:
In the past few months, I have had the opportunity to observe Linder And Associates, Inc., as the electrical sub-contractor on a new high school Renwick USD 267 is building. As the superintendent of the district, I am responsible for all the construction within the district.
During my brief association with Linder, they were asked to expedite the installation of the electrical service and six light poles for our newly built football stadium at Andale. Unlike other sub-contractors that I have worked with, Linder was willing to go the "extra mile" and provide the materials, personnel, and leadership to get the job done according to our needs. They understood the political problem we were under and made every effort to help us complete the football stadium before the first home game of the 2000 football season.
I would highly recommend Linder And Associates to anyone, based on the high level of quality and service we at Renwick School District have experienced.
I would certainly make myself available to anyone interested in hiring Linder And Associates.
Sincerely,
Dr. Dan Peters
Superintendent of Schools
PROJECT NUMBER 7185
UNITED WAREHOUSE - WICHITA
901 East 45th Street North
PH. 316-304-3808 FAX 316-268-0210
TO: Mark Carpenter, Larry Clark, Roy Arnett FROM: AL LAUGERE
Scott Hildreth, Tim O’Toole, Rick Thome
John Murray, Mike Lies, Warren Geiger,
Gary Raleigh, Jim Willoughby, Les Aaby
Richard Jansen,
RE: United Warehouse Addition
DATE: September 3, 2002
Sir, we have reached another milestone in the job with the issuance of The Certificate of Occupancy. This task was accomplished in a mere 10 weeks from the placement of the first concrete footing on the job on June 21,2002. What a wonderful accomplishment from a great team like you all. The team work was unsurpassed in all the 30 years I have been in this business.
I want to take this opportunity to thank and praise all of you for a job well done. The team that is now in place will make any job we tackle hard for other companies to follow. You all make my job easy and enjoyable, When I am asked how we did it I tell people that it was all the men on the job that produced these great results. All of you make The Law Company and myself look exceptional. Please give all your workmen a special THANK YOU for me.
If you have any questions regarding these matters , please do not hesitate to call this writer.
Sincerely Yours,
Al Laugere (Job Superintendent)
CC: Dennis Kerschen
UNITED WAREHOUSE - WICHITA
901 East 45th Street North
PH. 316-304-3808 FAX 316-268-0210
TO: Mark Carpenter, Larry Clark, Roy Arnett FROM: AL LAUGERE
Scott Hildreth, Tim O’Toole, Rick Thome
John Murray, Mike Lies, Warren Geiger,
Gary Raleigh, Jim Willoughby, Les Aaby
Richard Jansen,
RE: United Warehouse Addition
DATE: September 3, 2002
Sir, we have reached another milestone in the job with the issuance of The Certificate of Occupancy. This task was accomplished in a mere 10 weeks from the placement of the first concrete footing on the job on June 21,2002. What a wonderful accomplishment from a great team like you all. The team work was unsurpassed in all the 30 years I have been in this business.
I want to take this opportunity to thank and praise all of you for a job well done. The team that is now in place will make any job we tackle hard for other companies to follow. You all make my job easy and enjoyable, When I am asked how we did it I tell people that it was all the men on the job that produced these great results. All of you make The Law Company and myself look exceptional. Please give all your workmen a special THANK YOU for me.
If you have any questions regarding these matters , please do not hesitate to call this writer.
Sincerely Yours,
Al Laugere (Job Superintendent)
CC: Dennis Kerschen
ANDALE HIGH SCHOOL
RENWICK USD #267
November 6, 2000
Mr. Randy Sobba
Linder and Associates
840 N. Main
Wichita, KS 67211
Mr. Sobba:
On behalf of Andale High School and the Renwick School District, I want to express my appreciation to you and your company for the outstanding service we received this fall in putting up our football lights. It was apparent that you spent many long hours and much effort in a very short amount of time to make it possible for us to host a home game.
I was impressed with the professionalism and leadership of your jobsite foreman, Dave Woley. You should be very proud of the way he and the other workers represented Linder and Associates. I look forward to working with your company as we build a new high school. I would highly recommend your company to anyone who is looking for a good electrical company.
Sincerely,
Cara Ledy
Principal
Andale High School
RENWICK USD #267
November 6, 2000
Mr. Randy Sobba
Linder and Associates
840 N. Main
Wichita, KS 67211
Mr. Sobba:
On behalf of Andale High School and the Renwick School District, I want to express my appreciation to you and your company for the outstanding service we received this fall in putting up our football lights. It was apparent that you spent many long hours and much effort in a very short amount of time to make it possible for us to host a home game.
I was impressed with the professionalism and leadership of your jobsite foreman, Dave Woley. You should be very proud of the way he and the other workers represented Linder and Associates. I look forward to working with your company as we build a new high school. I would highly recommend your company to anyone who is looking for a good electrical company.
Sincerely,
Cara Ledy
Principal
Andale High School
Portions of a letter from EMC Insurance Companies
March 12, 2004
MR LARRY CLARK
SAFETY DIRECTOR
LINDER & ASSOCIATES
PO BOX 1202
WICHITA KS 67201-1202
RE: Policy 1X8 07 66 Jobsite Survey: Derby Aquatic Park, Mar 11, 2004
Dear Mr. Clark:
This is to confirm a jobsite safety survey conducted at the above referenced site. You accompanied me throughout this entire survey. We also met briefly with jobsite foreman, Chris Brewer. Individually, I met with the general contractor, Walz Harman Huffman Construction, Inc, construction superintendent, Jack Bollinger.
The comprehensiveness of your jobsite inspections is impressive indeed. It is through such thoroughness, I’m sure, that you breezed through a recent OSHA jobsite inspection at North High School’s jobsite without any citation! It was my privilege to walk through a complex jobsite with a journeyman electrician whose specific interest was employee safety. I found it quite educational, especially on some of the finer points of the construction industry standard for temporary wiring. Thanks, again!
Summary:
Mr. Clark, I appreciate you and your firm’s efforts to minimize your exposures to work place injuries. Even though all findings weren’t perfect on this job, your concern and passion for worker safety was clearly evidenced. As all items needing attention fall into a “minor” heading, no formal recommendations are submitted. I still see a very high standard on workplace safety at Linder & Associates and it is greatly appreciated.
Sincerely,
Jim Harms, CSP
Senior Loss Control Rep
March 12, 2004
MR LARRY CLARK
SAFETY DIRECTOR
LINDER & ASSOCIATES
PO BOX 1202
WICHITA KS 67201-1202
RE: Policy 1X8 07 66 Jobsite Survey: Derby Aquatic Park, Mar 11, 2004
Dear Mr. Clark:
This is to confirm a jobsite safety survey conducted at the above referenced site. You accompanied me throughout this entire survey. We also met briefly with jobsite foreman, Chris Brewer. Individually, I met with the general contractor, Walz Harman Huffman Construction, Inc, construction superintendent, Jack Bollinger.
The comprehensiveness of your jobsite inspections is impressive indeed. It is through such thoroughness, I’m sure, that you breezed through a recent OSHA jobsite inspection at North High School’s jobsite without any citation! It was my privilege to walk through a complex jobsite with a journeyman electrician whose specific interest was employee safety. I found it quite educational, especially on some of the finer points of the construction industry standard for temporary wiring. Thanks, again!
Summary:
Mr. Clark, I appreciate you and your firm’s efforts to minimize your exposures to work place injuries. Even though all findings weren’t perfect on this job, your concern and passion for worker safety was clearly evidenced. As all items needing attention fall into a “minor” heading, no formal recommendations are submitted. I still see a very high standard on workplace safety at Linder & Associates and it is greatly appreciated.
Sincerely,
Jim Harms, CSP
Senior Loss Control Rep
EMC Insurance Companies
August 28, 2001
Mr. Larry Clark, Safety Coordinator
Linder & Associates
PO Box 1202
Wichita, KS 67201-1202
RE: 1X8 0766 Recent Jobsite Safety Surveys
Dear Mr. Clark:
Thank you for assisting me in directing me to two of your jobsites. This letter will serve to confirm these visits. Dave Woley assisted me at the new Andale High School project and Steve Tillery escorted me through the York International addition. Both site visits were conducted on August 23, 2001. The cooperation I received from both was greatly appreciated.
I was impressed with both jobsites! The attention to detail was evident at both. Evidence of periodic safety training was easy to spot, from the condition of the equipment and tools, to the organized material stockpiles. Your supervisors were even pointing out other contractor's safety violations to me during the walk-arounds. That showed me the safety consciousness or climate that exists on Linder & Associates jobsites! It was refreshing to see. Keep up the good work.
Sincerely,
Jim Harms, CSP
Senior Loss Control Rep
August 28, 2001
Mr. Larry Clark, Safety Coordinator
Linder & Associates
PO Box 1202
Wichita, KS 67201-1202
RE: 1X8 0766 Recent Jobsite Safety Surveys
Dear Mr. Clark:
Thank you for assisting me in directing me to two of your jobsites. This letter will serve to confirm these visits. Dave Woley assisted me at the new Andale High School project and Steve Tillery escorted me through the York International addition. Both site visits were conducted on August 23, 2001. The cooperation I received from both was greatly appreciated.
I was impressed with both jobsites! The attention to detail was evident at both. Evidence of periodic safety training was easy to spot, from the condition of the equipment and tools, to the organized material stockpiles. Your supervisors were even pointing out other contractor's safety violations to me during the walk-arounds. That showed me the safety consciousness or climate that exists on Linder & Associates jobsites! It was refreshing to see. Keep up the good work.
Sincerely,
Jim Harms, CSP
Senior Loss Control Rep