Listing of Completed Projects Since 1996

 

Aircraft Heavy Industrial Light Industrial

 

Aircraft
Project Date Started Date Completed
Spirit Lighting Maintenance 06-2011 05-2014
Boeing Lighting Maintenance 06-2011 09-2012
Spirit Master Model 01-2011 12-2011
Spirit C Series M Jet 02-2011 11-2011
Boeing Service Contract 04-1987 06-2011
Spirit MPAC 09-2010 05-2011
Boeing Eby Cooling Tower   05-2011
Spirit SNK Foundation 02-2010 05-2011
Spirit Strut Drill #3 11-2010 04-2011
Spirit Camo I Hex Chrome 07-2009 03-2011
Air Products Service   03-2011
Beoing Wash Bay 10-2010 12-2010
Boeing 3-190Z Lift Station 09-2010 10-2010
Fuel Containment 01-2010 05-2010
Boeing Duct Bank 02-2009 05-2010
Paint Booth Upgrades 11-2009 05-2010
PEC Arc Flash Assist 06-2009 12-2009
South Hangar Ventilation 05-2009 12-2009
Boeing Arc Flash Study 08-2009 11-2009
Loxin Mill 04-2009 10-2009
Parking Lot R Crossover 01-2009 06-2009
Sikorsky Drill 12-2008 05-2009
Boiler Room Remodel 04-2008 04-2009
Nitrogen Project 07-2008 02-2009
400 Tank Line 10-2008 02-2009
Tank Line 11-2008 01-2009
South Hangar - Exterior 01-2007 08-2008
South Hangar - Interior 08-2007 08-2008
Scaffold Utilities, Phase I 01-2008 06-2008
Spirit Chem Mill 10-2006 03-2008
Spirit Bond Room Reactivate 11-2007 02-2008
Spirit Restroom Refurbish 09-2007 12-2007
Boeing Boilers (DEN) 02-2007 10-2007
Camouflage 3 05-2006 10-2007
Spirit Rooftop Units IPB2 04-2007 08-2007
Spirit Underground Fire Mains 11-2006 06-2007
ASB Infrastructure Expense 07-2005 05-2007
787 CFF Vacuum System 10-2006 05-2007
Multi-Axis Router 10-2006 05-2007
Laser Pattern Trace I & II 11-2006 05-2007
Gemcor "C" Frame Riveter 12-2006 05-2007
Mtgrs Framer 01-2007 04-2007
Spirit Mod Assembly Shop 05-2006 01-2007
Cutting Room IPB4 09-2006 01-2007
Sewer Lift, Warehouse 3 09-2006 01-2007
7E7 Wide Bay Capital Improvements 10-2004 12-2006
Assembly Door Sill 05-2006 12-2006
BAX Global Bldg. I-355C 02-2006 11-2006
Spirit Cargo Roadway 07-2006 11-2006
Spirit Law Offices 08-2006 11-2006
Spirit 7E7 Infrastructure ASB Mod 07-2005 10-2006
787 Cranes 08-2006 10-2006
C-Axis Controls 09-2006 10-2006
Boeing IDS Replace Chillers 23L 12-2005 10-2006
Boeing IDS Learning Center 02-2006 09-2006
Spirit Service Contract 06-2005 09-2006
Mandrel Assembly Foundation 10-2005 08-2006
Strut Drill 12-2005 08-2006
ICS Freezer for Fiber Tow Material 05-2006 07-2006
Boeing IDS South Campus Mods 10-2005 07-2006
Utility Separation 08-2005 06-2006
DDC Room Renovation 10-2005 06-2006
Relocate Gate 10-2005 06-2006
Boeing Nose Huts 03-2005 03-2006
Air Compressor Install 2500 SCFM 10-2005 03-2006
Boeing Fire Mains 04-2004 11-2005
Boeing Cyril Bath Control 07-2005 11-2005
Spirit MPF Chiller MUAU 01-2005 10-2005
Chip Conveyor System 08-2005 10-2005
Boeing Nose Hut Cable Package 03-2005 09-2005
Boeing ASB Shop Move to Nacelle 10-2004 08-2005
Boeing MPF Paint Booth Mods 11-2004 08-2005
Boeing Building 4056 G Deluge 06-2004 05-2005
Boeing Remodel for Tanker 11-2004 05-2005
Boeing Move Hydraulic Press 10-2004 03-2005
Boeing Master Model Feed 01-2004 11-2004
Boeing Water Knife Install 06-2004 09-2004
A/U MM to Nacelle 11-2002 01-2004
A/U Surplus Sales to Plant 1 06-2003 10-2003
Boeing Asset Utlization 05-2002 04-2003
Brojtes Plant II 11-2001 03-2003
757 Relocate 01-2002 02-2003
A/U Strut/Nacelle 08-2002 02-2003
A/U Raw Stock 06-2002 01-2003
X-Ray Vault 05-2002 08-2002
Tube Shop Relocate 06-2002 08-2002
Acid Etch Tank 10-2001 04-2002
255 K Comotara Move 10-2001 03-2002
Relocate Shop 3293 11-2001 12-2001
757 Tool Move 01-2001 10-2001
Boeing Plot & Scan Center Move 05-2001 10-2001
Gas Fired Heat 12-1997 02-2001
ARR-IPB3 06-2000 01-2001
IPB4 Renovation 05-1997 08-1999
PIB2 Cooling Tower 12-1998 05-1999
Boeing North Hangar Expansion 05-1997 07-1998
Structural Bond Fabrication 11-1997 05-1998
Bombardier Learjet Relight Building 5, 5B, 5D 11-1997 03-1998
Bombardier Learjet Relight Bldg 5C 10-1997 03-1998
BCS DDC 05-1997 08-1997
Learjet Building 6G 05-1996 07-1997
CMF Strategic 11-1996 03-1997
DDC Rooms 12-1996 03-1997
Bombardier Heat Detectors, Hangar 6F 07-1997 07-1997
Top of Page  Past Projects-Main  Home
Heavy Industrial
Project Date Started Date Completed
Air Products Service Contract 12-2005 06-2011
Hess Pump Station 08-2008 11-2009
Air Products PACM Park 04-2009 07-2009
Air Products Hydro Harvester 03-2011 06-2011
Air Products Hazardous Enclosure 01-2008 04-2009
Air Products Rail Car 12-2008 04-2009
ICM Garden City Service 05-2007 08-2007
Grede Foundry Railway Accident Repairs 07-2006 10-2006
Cooling Tower, Air Products North Plant 09-2005 11-2005
Air Products, Generator 05-2005 10-2005
Air Products Lab Building 10-2004 08-2005
CO5 E&I, Air Products & Chemicals 04-2004 07-2005
Petroleum Company Service Contract 12-2004 05-2005
Augusta KS, Power Plant 11-2002 11-2003
Hay & Forage Bus Duct 11-1997 12-1998
DCS Phase III, Vulcan Chemicals 02-1998 09-1998
DCS Phase II, Vulcan Chemicals 10-1997 07-1998
Vulcan Chemical R&D HVAC 09-1997 02-1998
Vulcan Chemical VFS 04-1997 12-1997
CLM II, Vulcan Chemical 03-1997 11-1997
Air Products Lighting Upgrade 04-1997 10-1997
Vulcan Chemical VCRU 12-1995 05-1997
Vulcan Chemical Tank Car Vent 01-1997 03-1997
Chlor 2, Vulcan Chemical 12-1996 02-1997
Top of Page  Past Projects-Main  Home
Light Industrial
Project Date Started Date Completed
Metal Improvement Fire Damage Repair 12-2006 05-2007
UPS Conveyors 01-2007 03-2007
United Warehouse Wichita Addition 01-2006 08-2006
Smith Tools Capacitor Bank Ponca City, OK 08-2004 01-2005
United Warehouse       Tulsa, OK 07-2003 03-2004
York Warehouse 02-2002 09-2002
United Warehouse Wichita 06-2002 09-2002
Wood Specialties 01-2002 07-2002
York Dock 01-2002 03-2002
The Hayes Company 01-2001 11-2001
York Manufacturing Facility 03-2001 11-2001
Form Systems 06-1997 03-1998
Kruse Service 11-1997 09-1998